NAPIT Registered Electricians

EV Charger Installation in Stretford & Manchester

Safe, certified electric vehicle charge point installations for homes, rented properties and business premises across Greater Manchester and Cheshire.

Project EV 7kW smart wallbox electric vehicle charge point with illuminated green LED status ring and tethered charging cable
NAPIT registered electricianNAPIT Registered
TrustMark Government Endorsed QualityTrustMark Registered

Professional EV Charger Installation in Greater Manchester

Charging your electric vehicle at home or at your workplace is the most convenient and cost-effective way to power your car. Standard 3-pin plugs are not designed for sustained high-amperage charging over long hours. We install dedicated 7kW smart EV chargers powered by a dedicated circuit direct from your consumer unit, giving you faster, safer and reliable charging.

As NAPIT registered electricians, we inspect your existing electrical installation, earthing system and main supply fuse before any work begins. We install the correct circuit protection with Type A or Type B RCDs, PEN fault detection or dedicated earth rods where required, and ensure the cabling is routed neatly with steel wire armoured cable or high-grade conduit.

Every EV charger installation is tested to BS 7671 standards and signed off under Part P of the Building Regulations. You receive an Electrical Installation Certificate from us, a Building Regulations compliance certificate from NAPIT, and we complete the required DNO (Distribution Network Operator) notification on your behalf.

What is Included

  • Dedicated high-capacity circuit wired directly from your consumer unit
  • Supply and installation of tethered or untethered 7kW smart wallbox chargers (such as Project EV and other leading brands)
  • Integrated PEN fault detection or compliant earth electrode installation
  • DNO (Electricity North West) network notification paperwork completed on your behalf
  • Full electrical testing, Electrical Installation Certificate and NAPIT Part P compliance sign-off
Recent EV Charger Installations

Electric Vehicle Charger Installations by SH Electrical

Dedicated 7kW home and commercial wallbox installations, certified to BS 7671 standards with full Part P and DNO compliance.

Project EV 7kW smart wallbox electric vehicle charge point with illuminated green LED status ring and tethered charging cable

Project EV 7kW Smart Charge Point

Wall-mounted 7kW Project EV smart wallbox charger with active illuminated green LED status ring, dedicated sub-circuit protection, and vehicle charging cable connected.

When To Act

When to Book Your EV Charger Installation

  • You have taken delivery of an electric or plug-in hybrid vehicle and need dedicated home charging
  • You want faster, safer 7kW charging rather than relying on a standard 3-pin trickle socket
  • You are a landlord upgrading a rental property to attract EV-driving tenants
  • You need smart scheduled charging to take advantage of off-peak electricity tariffs (such as overnight EV tariffs)
  • You are a local business providing workplace charging for company vans, staff or customers
Pricing

What Affects the Price

We give you a clear price before any work starts. These are the main factors that shape the quote.

1

Distance and cable route from your consumer unit to the proposed charger mounting location

2

Whether your existing consumer unit has available spare ways or requires a dedicated mini enclosure

3

Specification of the charger unit: tethered with attached cable versus untethered socket

4

Groundwork, surface-mounting or trenching required to run cabling across pathways or driveways

5

Condition of your property's main incoming supply, earthing and main protective bonding

How It Works

How It Works

1

Call Kyle on 07870 895049 or submit the quote form with details of your property and vehicle.

2

We check your fuse board capacity, cable route and charger location, then give you a clear price.

3

We install the dedicated circuit, mount and wire your wallbox charger, and test the system.

4

We issue your Electrical Installation Certificate, register NAPIT Part P, and notify the DNO.

Tidy Work, Every Time

We lay dust sheets down, keep the work area tidy, route external cabling neatly, and remove all packaging and waste when the job is done.

EV Charger Installation FAQs

EV Charger Installation FAQs

Ready to Discuss Your Electrical Work?

Call Kyle or send the form for a free, no-obligation quote.